Al-Mahdi Aluminum Factory
Due to extremely heavy structures of the above project design, and since there were no bracings considered in its manufacturing of steel parts and erection of the steel components was one of the most different jobs ever done .
The main structure is an eleven-floor building, which is 2000 tons. All the required steel structures were made in Kanrood Sazeh steel structure workshop in Tehran.
Another part of the project was 21 daily silos with the total weight of 220 tons and the height of 18 meters.





 |